FEASIBILITY STUDIES

POWER PLANT

Volume 1 Executive Summary
Volume 2 Main Report
Volume 3 Drawings
Volume 4 Annex 1
Volume 5 Annex 2

T LINES

Volume I

Chapter01 A-Annex 1-2
Chapter01 A-Annex 1-1
Chapter01 Summary


Volume II

Chapter02 Intro FS-Final
Chapter03 Findings__FS-Final.
Chapter04 Load_forecast F Final
Chapter04A Annex4-1_Burundi_FS-Final
Chapter04A Annex4-2_Rwanda_FS-Final
Chapter04A Annex4-3_Tanzania_FS-Final
Chapter05 Summary
Chapter06 Summary
Chapter07 Summary
Chapter08 Summary
Chapter09 Summary
Chapter10 Summary
Chapter11 Summary
Chapter12 FinEco_FS-Final
Chapter13 RSWI_Institutional_FS-Final
Chapter14 Risks__FS-Final
Chapter15 Impl__Schedule_FS-Final

Volume III

Chapter05_Chapter05_(Annexes)

Power_System_FS-Final
Chapter06A-Annex_6-1(FIACAD_042)
Chapter06_Substation__Design_FS-Final

Chapter06A-Annex_6-2(FIACAD_041)
Chapter06A-Annex_6-3(FIACAD_036)
Chapter06A-Annex_6-4(FIACAD_035)
Chapter06A-Annex_6-5(FIACAD_040)
Chapter06A-Annex_6-6(FIACAD_030)
Chapter06A-Annex_6-7(FIACAD_032)
Chapter06A-Annex_6-8(FIACAD_031)
Chapter06A-Annex_6-9(FIACAD_027)
Chapter06A-Annex_6-10(FIACAD_028)
Chapter06A-Annex_6-11(Costs)
Chapter07_OHL_FS-Final

Chapter07A-Annex_I_(Tower_Design)
Chapter07A-Annex_II_(Tower_Hardware)
Chapter07A-Annex_III_(Tower_Grounding)
Chapter07A-Annex_IV_(Electric_Clearance)
Chapter07A-Annex_VII_(Costs)
Chapter07A-Annex_V_(Geology)
Chapter07A-Annex_VI_(Geotechnique)

Volume VI

Vol-VI_Rural_Electrification_Report_Annex01_Project_Area(30-03-2009)
Vol-VI_Rural_Electrification_Report_Annex04
Vol-VI_Rural_Electrification_Report_Annex03
VI_Rural_Electrification_Report_Annex02
Vol-VI_Rural_Electrification_Report_FS-Final