NELSAP RAP ADDENDUM - BACKWATER FLOODING ON TANZANIA SIDE

NELSAP RAP Addendum - Backwater Flooding on Tanzania Side

RAP FOR PEOPLE AFFECTED BY THE OPERATION FLOODING IN TANZANIA

RAP FOR PEOPLE AFFECTED BY THE OPERATION FLOODING IN TANZANIA

Addendum to the Main Resettlement Action Plan (RAP) for People Affected by Operation Flooding in Rwanda

Addendum to the Main Resettlement Action Plan (RAP) for People Affected by Operation Flooding in Rwanda

 

NELSAP RAP Addendum Revised-Backwater Flooding-Rwanda Side

NELSAP RAP Addendum Revised-Backwater Flooding-Rwanda Side

Addendum to the Main Resettlement Action Plan (RAP)
Site Specific RAP for Extra Land on Tanzania Side- land acquired for construction of borehole and its access road for water supply to the Power House Residential Camp.

English Disclosure addendumto the RAP
Swahili Disclosure addendumto the RAP

1. Site Specific RAP for Extra Land on Tanzania Side- land near the ferry affected by the back water due to the river diversion and coffer dam construction works.

Swahili for disclosure - addendum to the rap - land near ferry 4 may- translated

English for disclosure - addendum to the rap - land near ferry 4 may-revised after clearance 30th June – August 2020

2. Site Specific RAP for Land on Tanzania Side- Land for an Absentee PAP.

Swahili _for disclosure-addendum to the rap --absentee pap-power house area_ 4 may translated 

English for disclosure-addendum to the rap --absentee pap-power house area_ 4 may for disclosure July –August 2020

The RAP has been developed as one consolidated document, covering the affected communities in both countries, Rwanda and Tanzania. The proposed project is however a joint development undertaking by the Governments of Burundi, Rwanda and Tanzania. Compared to the previous Project designs, the RoR has resulted in significant reduction of impacts with regard to types, magnitude and extent. For details refer to the Attached reports.

Volume I /Main report

Volume II/Appendix

Volume III/Annexes

Volume IV/Summary

Addendum to the Main Resettlement Action Plan (RAP)

Site Specific RAP for Extra Land on Tanzania Side-Power House Area its Access Road, Administrative Area its Access Road and the Slope Protection (Safety and Environmental Protection)

Addendum to the Regional Rusumo Falls Hydro Power Project (RRFHPP) main Resettlement Action Plan (RAP);

Site Specific RAP for Extra Lands at the Switch Yard, Access Road, Area for
Transmission Line from Power House and Access Road to Sand Quarry (Nyakwisi) on
Rwanda side.