Construction Contractor – Environmental, Social, Health and Safety Management Plan (CP-1ESHSMP)

1. CC-ESHSMP PART 1

• CC-ESHSMP_PART 1 revised

2. CC-ESHSMP PART 2

• List of Abbreviation& Introduction

• QA form for ESHSMP part 2

STP01: Erosion and Sediment Control Plan;

Erosion and sedimentation control plan

Stp01 appendix 1  list and sizing of sedimentation tanks and oil separator

Stp01 appendix 2  drainage system of batching plants

Stp01 appendix 3 anti-erosive sysyems

STP02: Spoil Disposal Management Plan;

Spoil disposal management plan

Stp02 appendix 1 characteristics of the permanent deposit area

STP03; Quarry, Borrow Areas and Water Intake Management Plan;

Borrow areas and water intake management plan

Stp 03 appendix 1 weekly blasting plan

Sp03 appendix2 montly blasting plan

Sp 03 appendix 3 blasting procedures & assessment of impacts

Stp03 appendix 4 annual blasting plan

Stp03 appendix 5  water intake blasting guidelines

Stp03 appendix6 tunnel blasting guidelines

STP04: Solid Waste Management Plan;

Solid Waste management plan

Stp04 appendix 1 list of produced waste per site

Stp 04 appendix 02 diagram of industrial waste  treatement

Stp04 appendix 3 industrial and domestic waste management procedures

SP04 Appendix4 Contract for solid waste evacuation

Stp04 appedix5  kirehe hospital medical waste contract

STP 04 Appendix 6 Ngara hospital contract medical waste

STP05: Hazardous Products and Waste Management Plan;

Hazardous products and waste management plan

Stp05 appendix01 tracking sheet for input and output of hazardous material

Stp05 appendix 02blasting weekly planning

Stp05 appendix 03 emergency procedure for hazardous product leakage

Stp05 appendix 04 description of environmental protective equipment on the petroleum deposit site

STP06: Spill Emergency Preparedness and Response Plan;

Sp 06 appendix1  wastewater treatment system septic tank puisard

Sp 06 appendix2 hyfrocarbon treatment system  separator oil  water

Wastewater management plan

STP07: Wastewater Management Plan;

Emergency prepardness and response plan

Stp 07 appendixes 1 classification of spills and responsibility of members

Stp07appendix 2 emergency procedure for hazardous product leakage

Stp07 appendix 03 emergency medical plan

Stp07 appendix 04 fire prevention and protection plan checklist

STP08:  Water Quality Management Plan;

Stp08 appendix 01 water analysis results

Stp08 appendix 2 water analysis report

Stp08 appendix 3 water quality monitoring programme on the site

Stp08 appendix 4 performance of monitoring procedure

Water quality monitoring plan

STP09: Air Emissions and Dust Control Plan;

Stp09 appendix 01  action plan for dust  control

Stp09.appendix02 air quality monitoring format

Stp09.appendix03  monitoring  program of air quality  on  site

Stp09 appendix 04parameters  for laboratory analysis during underground excavations

Air emission & dust control plan

STP10: Noise and Vibration Control Plan;

Stp 10 appendix 1 data collection of noise pollution sources

Stp 10 appendix 2health and safety measures for undeground activities

Stp10  noise& vibration control plan

STP11: Site Decommissioning and Rehabilitation Plan;

Stp 11 appendix 1 technical route of the revegetation

Stp11 appendix 2 calendar of sites decommissioning& rehabilitation

Site decommissionning & rehabilitation plan

STP12:  Physical Cultural Resources Plan;

Pcr plan

Stp12 appendix01 chance find procedure& guidelines

Stp12.  Appendix 2 pcr  registration formrusumo falls hydropower power project

STP13: Occupation Health and Safety Management Plan;

Stp13 Appendix 1 Heavy Object Handling

Stp13 Appendix 2   Epidemic Warning Procedure

Stp 13 Appendix 3 Vector Control Contract

Stp13 Appendix 4 Ppe Per Stations

Spt13 Appendix 5 Hospital Conventions

Stp13 Appendix 6 Pharmacy Conventions

Stp13 Appendix 7 Weekly Report Of Activity

• Stp 13 Appendix 8 Register Of Ambulance Displacement .

Sp13 Appendix 9 Follow-Up Days Off

Stp 13 Appendix 10  Health Center The Life Of Workers

Stp13 Appendix11 Worker Medical Insurance

Stp 13 Appendix 12 Chinese Staff Insurance

Stp13 Appendix 13 Health Clinic Plan

Stp13 Appendix 14 Medical Emergency Plan & Transfer Procedures

Stp13 Appendix 15 First Aid Kit & Trauma Kit

Stp13 Appendix 16 Pre-Employement& Annual Check Up

Stp13 Appendix 17 Work Permit Form

Stp13 Appendix 18  Safety  Flash  Information  Form

Stp13 Appendix 19 Lifting Operation Plan Form

Stp 13 Appendix 20 Work At Height  Assessment  Form

Stp13 Appendix 22 Social Security Forms

Stp13 Appendix 23 Worker Medical Check Up Results

Stp13 Appendix 24  Note Regarding Of  Health Baseline

Stp13 Appendix 25 Ambulance Equipment Approval

Ohs Plan

STP14: Work Camps Management Plan;

Stp14 appendix 1 internal regulation

Stp14 appendix 2 food supply contract

Stp 14 appendix 3 maintenance procedure of worker camps

Stp 14 appendix 4 anti-vector control procedure

Stp 14. Appendix 5 procedure of drinking water distribution in the worker camps

Stp14 appendix 6  warning form

Stp 14stp 14. Appendix 7 monitoring of renewal of materials at the of workercamps

Stp14 appendix 8 wasac letter water quality analysis

Stp14 appendix 9 transport procedure of workers

Work camp management plan

STP15: Recruitment   and Labor Management;

Coc

Contract template

Recruitment and labor management plan

Stp15 appendix list of staff and their post

Stp15 appendix 1  recruitment procedure

Stp15 appendix 4 recruitment schedule for local staff

STP16:   Road Traffic and ESHS s Management Plan;

Stp 16 appendix 1  management of traffic accidents

Stp 16 appendix 2  authorised persons on the sensitive areas

Stp 16 appendix3  monitoring of machinery and traffic

Stp 16 appendix4 form of weekly monironing vehicles

Transport and site access plan

STP17: ESHS Training Plan;

Eshs  training plan

Stp17 appendi 1 induction course conducted

Stp17 appendix02 general training

Stp17 appendix 3 specific training

Stp17 appendix4 training follow-up form

Stp17. Appendix 5 display of awareness